Loading tools…
Loading tools…
Upload 2-4 contractor bids to normalize scope, reveal missing line items, and call out price outliers. Or analyze one bid when you only have a single quote.
Every extracted field remains editable. Low-confidence reads are surfaced for review instead of treated as facts.
Smart Bid Score
It grades margin, benchmark fit, missing scope, and deposit risk with visible assumptions. No hidden model call.
Smart Bid Score: Sample bid
Deterministic margin, risk, and benchmark coaching. No model call.
24
High-risk bid
Margin (benchmark proxy)
-182%
Target 15% using benchmark cost proxy $11,275.
Formula: ($4,000 bid - $11,275 cost basis) / $4,000 bid = -182% gross margin.
Submitted total
$4,000
Scope basis: 25 squares for Mountain / Front Range TPO membrane.
Risk flags (5)
5
All 5 flags are listed below; first Actual cost lines missing, Negative margin, Price far below benchmark.
Total price review band
-74%
Submitted total is -74% vs the Mountain / Front Range TPO membrane normalized review band.
Coaching
Assumptions
Worked example: what the result looks like
Example only, not a real contractor bid: $4,000 for 25 squares of TPO (Thermoplastic Polyolefin), no license number, no stated warranty, and a 50% deposit.
Verdict
Significant red flags — proceed with caution
Submitted total
$4,000
Follow-up
17 questions to ask
Drop a contractor's bid — PDF or photo — we'll read it for you
The upload only pre-fills visible fields. You stay in control of the final values before analysis.
Drag here or click to upload
PDF, JPG, PNG, WebP, or GIF up to 12 MB
Form progress
0 of 3 required entries ready