A specialist working surface for Division 7 manufacturer reps and technical teams. Turn contractor questions, field photos, and manufacturer documents into review-gated submittal packages, warranty readiness checks, taper-design intake, and training tracking — without burying reps in admin work.
This is a working surface. No outreach, customer contact, or production data is sent from /rep-os.
Every output is Draft until reviewed. MRG does not issue manufacturer warranties, approve assemblies, finalize taper designs, or replace reps, designers, or manufacturers.
Reference profiles for the Mountain-region and Western Division 7 rep firms this surface is being built around. Verify directly before any outreach.
Mountain-region rep firm pattern: dense bid pipeline, contractor field support, strong tie to commercial GCs and architects. Confirm current portfolio and territory directly with the firm before any outreach.
Elevate / Building Solutions group
Elevate-aligned rep activity. Verify current Holcim / Elevate brand structure and authorized contractor list before formal submittal sign-off.
Multi-line western commercial rep pattern. Treat product alignment as 'represented lines' not authorized manufacturer approval.
Template profile so reps from other firms can stand up their own scoped command center without overclaiming MRG-side personalization.
16 manufacturer profiles · 48 document slots flaggedsource required. MRG does not host or fabricate manufacturer PDFs — slots stay empty until a rep attaches a verified source.
Holcim
Warranty: Red Shield warranty program: NDL terms tied to authorized contractor + system inspection. Confirm current program tier and pre-installation notice with manufacturer before quoting warranty terms.
Holcim / Elevate family
Warranty: GenFlex distinguishes full-system warranty (deck-up, qualified contractor, qualified components) from product-only warranty (membrane only). Reps must not promise full-system terms unless full-system requirements are met.
Holcim
Warranty: Silicone restoration coating warranty depends on substrate prep, mil thickness, and inspection. Confirm coverage tier before quoting.
Warranty: Carlisle system warranty (Sure-Weld TPO, Sure-EPDM, Sure-Flex PVC) typically requires authorized contractor, pre-job notice, and final inspection. Treat warranty length and terms as project-specific.
Carlisle Companies
Warranty: Versico shares system architecture and contractor authorization conventions with Carlisle. Verify which entity issues the warranty before submittal.
Carlisle Companies
Warranty: Independent contractor channel; warranty terms differ by program tier. Confirm contractor program enrollment status.
Warranty: ANSI/SPRI ES-1 edge metal. Many membrane manufacturers require ES-1 tested edge for full-system warranty. Confirm edge profile and termination detail with the membrane manufacturer.
Warranty: Standing seam panel and finish warranty (Kynar 500 / PVDF) terms separate from weather-tightness. Verify which is being quoted.
Warranty: Glass-mat gypsum cover board. Required by some membrane manufacturers under FM and high-wind systems; confirm assembly compatibility with the membrane manufacturer.
Warranty: Air & vapor barrier and liquid-applied flashing systems. Compatibility with adjoining membrane manufacturer must be confirmed in writing.
Warranty: Standing seam metal panels and Drexel-fabricated edge profiles. Finish vs. weather-tightness warranties tracked separately.
Warranty: Glass-mat gypsum cover board family. Confirm specific Securock product (Roof Board / Brand) approved by the membrane manufacturer for the assembly.
Warranty: Electronic leak detection / vector mapping system. Compatibility and warranty effect on host membrane should be confirmed.
Warranty: Rooftop pipe and equipment supports. Confirm membrane manufacturer's accepted pipe-support attachment method on warrantied roofs.
Warranty: Clay roofing tile. Steep-slope assembly; warranty terms separate from underlayment and flashing components.
Warranty: Architectural metal panels and trim. Confirm coil source and finish warranty terms before submittal.
Local working queue for submittal, warranty, recommendation, taper, field, sample, training, and quote requests. Nothing here writes to production or sends outreach.
| Request | Company | Project | Manufacturer / System | Urgency | Bid date | Next action | Status | Manage |
|---|---|---|---|---|---|---|---|---|
Submittal Package Project Manager | Sample Commercial Roofing Co. | 1200 Sample Industrial Way, Denver CO | Carlisle SynTec 60-mil Sure-Weld TPO, mechanically fastened, polyiso + DEXcell Warranty target: 20-year NDL system | This Week | 2026-05-15 | Confirm contractor authorization status and pre-job notice Plans uploaded (sample) · Spec section pending · Pre-job notice not yet filed | Draft | |
Taper Design Intake Estimator | Sample Roofing Group | 880 Sample Plaza, Salt Lake City UT | Elevate (Hunter / ISO 95+) Tapered polyiso 1/4 in/ft, R-30 target, 4 drains Warranty target: 20-year system, no ponding | Bid Day | 2026-05-22 | Hand off to qualified taper designer for finalized layout and R-value confirmation Roof plan uploaded (sample) · Drain locations marked · No ponding survey yet | Rep Reviewed | |
Warranty Support Facilities | Sample Property Group | 27 Sample Industrial Dr, Cheyenne WY | GenFlex Existing TPO, 12 yrs old, two seam concerns Warranty target: Active warranty review | This Week | n/a | Confirm warranty registration and inspection requirements Field photos pending · Original warranty PDF requested from owner | Draft |
Assemble a Division 7 submittal package. Each section is empty until a verified source is attached or noted. Manufacturer issues the actual approved submittal — this surface prepares the package. Drafts persist locally in your browser; nothing is sent.
0/0 sections marked ready · 0%
Drafts in flight
No active draft selected — create or pick one above.
Pre-issuance readiness checklists. MRG does not issue manufacturer warranties; the manufacturer issues the actual warranty after pre-job notice, inspection, and approval.
Elevate (formerly Firestone Building Products) · 9 items
Readiness checklist for Elevate (formerly Firestone) Red Shield-style NDL system warranty. Final terms set by the manufacturer at issuance.
GenFlex · 6 items
GenFlex distinguishes a full-system warranty (qualified contractor, qualified components, inspected) from a product-only warranty (membrane only). This list helps a rep avoid misrepresenting which one is in play.
Carlisle SynTec Systems · 9 items
Readiness checklist for Carlisle and Versico system warranties (Sure-Weld TPO, Sure-EPDM, Sure-Flex PVC).
Capture the intake fields a qualified taper designer needs before they finalize layout, R-value, and material list.
Most current roof plan PDF or DWG. Note revision date. Confirm dimensions are accurate before sending to designer.
Mark each drain and scupper with grid coordinates or callouts. Note any drains being added or relocated.
Existing structural slope (in/ft or %). Note direction. If unknown, mark as 'TBD by site survey'.
Target slope to drains (commonly 1/4 in/ft minimum for code). Confirm against project specifications.
Locations behind curbs, walls, and at valleys. Note dimensions and slope rate where prescribed.
Photos and locations of current ponding. Designer will use this to bias slope correction.
Steel / concrete / lightweight concrete / wood / structural concrete. Affects fastening and weight assumptions.
Code-required R-value plus any owner energy program target (e.g., LEED, owner sustainability target).
Preferred polyiso / cover board manufacturer. Designer matches stock thickness and product family accordingly.
When the rep needs the finalized taper layout and material list back. Build in review time.
Plan, callouts, photos, R-value target, deck type, and bid deadline assembled in one package before sending to qualified designer / manufacturer.
When ready, the rep hands the assembled packet off to a qualified designer or the manufacturer's design service. MRG does not finalize taper designs.
Product demos, installer certifications, lunch-and-learns, and AIA/CEU activity. Local working list — nothing schedules a real session or sends an invite.
Cover board selection under high-wind FM assemblies
Architecture firm — sample · On-site at architect office · 12 attendees expected
Bring printed assembly handout. Capture spec sections that need cover board language updated.
Elevate authorized installer recertification
Sample contractor crew · Manufacturer training facility · 5 of 6 crew completed
One foreman missed final session — schedule make-up before next bid where Elevate Red Shield is targeted.
Air & vapor barrier compatibility with low-slope assemblies
Sample architect group · AIA chapter meeting · n/a
Confirm CEU credit registration code 5 days prior.